Here is a list of road and lane closings in the Akron area:

Major highways abruptly closed: None.

AKRON:

?I-76, between the Kenmore leg and the Portage County line: Until further notice, there will be nightly lane restrictions from 7 p.m. to 6 a.m. for concrete pavement repairs.

?I-76/Kenmore leg, between East Avenue and Battles Avenue: Reduced to one lane in each direction until further notice each night from 7 p.m. to 5 a.m. for pedestrian bridge repairs.

?Newport Road, between Eaton Avenue and Delaware Avenue: Closed including the intersections at each end for water main work until Friday. A detour will be posted. Emergency vehicles will have access at all times.

?Rand Avenue and Dart Avenue, between West Exchange Street and West Market Street: Work has begun on the right lanes of both streets until further notice. Once the right lanes are completed, work will be begin on the left lanes in preparation for the removal of state Route 59 between West Exchange and West Market which is planned for early in 2017. Traffic will be maintained.

?West Waterloo Road, between Eagon Street and 30th Street Southwest: Closed for sewer reconstruction for about the next two months. A detour will be posted. Emergency vehicles will have access at all times.

?Hilbish Avenue, at the intersection of Faye Road: Closed through July 8 for reconstruction of a sanitary sewer. A detour will be posted. Only local access permitted from either end of detour closing. Emergency vehicles will have access at all times.

?Kentucky Avenue, between East Avenue and 29th Street Southwest: Closed until Friday for sanitary sewer repairs. A detour is posted. Emergency vehicles have complete access at all times.

?Polk Avenue, between 12th Street and Verde Avenue: Closed until July 8 for sewer reconstruction. A detour is posted. Emergency vehicles have complete access at all times.

?Florida Avenue, between East Avenue and 26th Street Southwest: Closed through mid-July for sanitary sewer repairs. A detour will be posted. Emergency vehicles have complete access at all times.

?Riverview Road, between Smith Road and Bath Road: Closed until further notice to rehabilitate a portion of the Main Outfall Sewer. There will also be lane restrictions from Lock 22 Plaza on Merriman to Smith Road. Detours are posted.

?West Wilbeth Road/Edwin Avenue project: Installation of new gas mains until late July on West Wilbeth from Manchester east about 2/3 mile; Edwin Avenue, north of Lockwood Street to West Wilbeth; and Koerber Avenue, from just west of Edwin Avenue to just east of Edwin. There will be minimal lane closings and flaggers will assist with traffic flow.

?East Avenue, between Harpster Avenue and Louisiana Avenue: Closed until Friday for construction. A detour is posted.

?East Wilbeth Road, between Brown Street and I-77: Closed for construction until late October. A detour will be posted. Local residents and emergency vehicles will have access on East Wilbeth between South Main Street and Brown Street.

?Glendale Avenue, from Rand Avenue to the intersection of Locust Street: Closed until late 2018 for work on the combined sewer overflows project at the Ohio Canal Interceptor Tunnel. Detours will be posted. The right lane of West Mill Street, west of Dart Avenue, and the south 150 feet of Bates Street will also be closed. Detours will be posted.

?East Market Street, between Cook Street and Willard Street: Lane restrictions for sanitary sewer repairs and water main construction until late August. Work includes reconstruction walks, lighting, crosswalks and resurfacing. Lane configurations will be changed as work progresses.

?South Main Street and South Broadway, from Bartges Street to South Street: Lane restrictions until Friday for reconstructing and replacing conduit and manholes in preparation for the Interstate 76/High Street/Main Street interchange project. Work zones may change often so lane closings and traffic pattern revisions will occur periodically. Delays should be expected.

?Seiberling Street, between Innovation Way/Seiberling Street roundabout and Archwood Avenue: Closed until Aug. 12 for reconstruction of sanitary sewers. Business and emergency vehicle access on Seiberling Street will be provided. Entrance to businesses may access from the roundabout or from Seiberling at Archwood Avenue dependent on location of the work site. A detour is posted.

?18th Street and Idaho Avenue project: Installation and reconstructing gas mains until July 8 on the following streets: 17th Street, from Kenmore Boulevard to Battles Avenue; 18th Street, from Kenmore Boulevard to Iona Avenue; 19th Street, from Florida Avenue to Harpster Avenue; 20th Street, from Battles Avenue to Iona Avenue; Kenmore Boulevard (north side), from 17th Street to 18th Street; Florida Avenue, from 18th Street to 19th Street; and Chandler Avenue, from 18th Street to 20th Street. Work will start on 17th Street. Work areas will be posted with minimal lane closings and flaggers will assist with traffic.

Newton Street and St. Leger Avenue project: Installation and reconstructing gas mains through Friday on the following streets: Newton Street, from Goodyear Boulevard to Morningview Avenue; Honodle Avenue, from Watson Street to Morningview Avenue; Ottawa Avenue, from St. Leger Avenue to Morningview Avenue; Tonawanda Avenue, from Goodyear Boulevard to Morningview Avenue; Malasia Road, from Watson Street to Morningview Avenue; Watson Street, from Malasia Road to Tonawanda Avenue; St. Leger Avenue, from Newton Street to Tonawanda Avenue; and Morningview Avenue, from Preston Avenue to Huguelet Street. Work areas will be posted with minimal lane closings and flaggers will assist with traffic.

?Manchester Road and Allenford Street project: Installation and reconstructing gas mains through Thursday on the following streets: Manchester Road, from Wilbeth Road to Maringo Avenue; Koerber Street, from Manchester Road to Edwin Avenue; Allenford Street, from Manchester Road west to dead end; Allenford Street, from Manchester Road to Nesmith Lake Boulevard; Westmoreland Street, from Manchester Road to Nesmith Lake Boulevard; Celtic Street, from Manchester Road to east of Pelton Avenue; Stanford Street, from Manchester Road to east of Edwin Avenue; Lockwood Street, from Manchester Road to east of Nesmith Lake Boulevard; Rexford Street, from Manchester Road west to Nesmith Lake Boulevard; Maringo Avenue, from Manchester Road west to dead end; and Edwin Avenue, from Stanford Street to Eckard Avenue. Work areas will be posted with minimal lane closings and flaggers will assist with traffic.

?Rhodes Avenue and Bishop Street project: Installation and reconstructing gas mains through Friday on the following streets: Rhodes Avenue, from South Maple Street to Monroe Street; Douglas Street, from Bishop Street to Cedar Street; Bell Street, from Bishop Street to South Maple Street; Bishop Street, from Douglas Street to Bell Street; Lillian Street, from Douglas Street to Bell Street; and Monroe Street, from Rhodes Avenue to Edgewood Avenue. Work areas will be posted with minimal lane closings and flaggers will assist with traffic. Two lanes will be closed at various times on Cedar Street from Maple Street to the east side of Belle Street for utility road crossings.

?Dan Street, between East North Street and Evans Avenue: The road is closed for sanitary and storm sewer construction until November.

?Hickory Street, between North Street and Memorial Parkway: Closed until late 2018 to prepare for work on the Ohio Canal Interceptor Tunnel. It includes the temporary relocation of the Towpath Trail to Hickory Street from Maple Street to near Memorial Parkway.

Other road construction:

Elsewhere in Summit County:

?Minor Road, on the east side of state Route 21 in Copley Township: Closed through early July to construct acceleration and deceleration lanes at the Minor Road/Route 21 intersection. Detour will be Route 21 northbound to Copley Road to Cleveland-Massillon Road.

?State Route 21, between state Route 261 and state Route 162/Copley Road in Copley Township: Daily lane restrictions for median crossover construction until further notice.

?State Route 18/Medina Road in Bath and Copley townships: Occasional lane restrictions between I-77 and Hametown Road for road widening until further notice.

?State Route 91 (North Avenue) southbound, between Howe Road and the Tallmadge Circle: Closed through mid-December for road widening. Detour is Howe Road to state Route 261 (Northeast Avenue).

?State Route 91, between Post Road and Glenwood Drive in Twinsburg: Daily lane restrictions for drainage installation and widening of the northbound side of state Route 91 until further notice. The project also includes drainage repairs and installation of a roundabout on Route 91 and Glenwood Drive.

?Glenwood Drive, on the west side of state Route 91 in Twinsburg: Closed through mid-August for road construction. Detour will be Route 91 to OFC Joshua Miktarian Memorial Parkway to Ravenna Road. This portion of the road will not close until the other side is reopened.

?State Route 303, just west of Olde 8 Road in Boston Heights: Reduced to one lane maintained by a traffic signal until late August for bridge rehabilitation. During this time, traffic exiting the Metro Parks trailhead onto Route 303 and on Olde 8 Road at the intersection with Route 303 will not be permitted to make right turns.

?I-271 in Richfield and Richfield Township: There is a bidirectional traffic pattern on I-271 northbound from just north of the Medina County line to the Ohio Turnpike. Although two lanes of traffic will be maintained in each direction on I-271 southbound, traffic will be split with one lane of southbound traffic crossed over onto I-271 northbound while the second lane remains on the I-271 southbound side.

?I-271, between state Route 8 and the Cuyahoga County line in Macedonia: Lane restrictions for road widening until further notice. Speed limit in this area is reduced to 50 mph during construction.

?I-271 southbound, one mile south of state Route 8 in Northfield Center Township: Reduced to two 10-foot lanes for slope repair until further notice.

?State Route 82, between state Route 8 and South Bedford Road in Macedonia: There will be nightly lane restrictions for road repairs until further notice.

?State Route 82, between Alexandria Drive and Longwood Park in Macedonia: Reduced to one 10-foot lane in each direction for road widening until further notice.

?I-480 in Twinsburg, Macedonia, Hudson and Twinsburg Township: There will be nightly lane restrictions between the Portage County line and Cuyahoga County line from 7 p.m. to 6 a.m. for pavement repairs and microsurfacing until further notice.

MEDINA COUNTY:

?I-71 southbound exit ramp and state Route 303: The ramp and Route 303 just west of the I-71 interchange will have intermittent lane restrictions for a widening project until September.

?I-76, at its interchange with state Route 94 (High Street) in Wadsworth: Intermittent single-lane closings as part of the Route 94 corridor improvement project. I-76 currently has the inside and outside shoulders closed. Off-peak lane closings are possible. Route 94 will be reduced to one lane of through traffic and one left-turn lane in each direction to complete widening along the east side of Route 94 from its bridge over I-76 to Smokerise Drive.

?U.S. 42 (Pearl Road)/Fenn Road improvement project: U.S. 42 will be widened for about one-half mile through the intersection of Fenn Road, as well as widening one-quarter mile of Fenn Road until late June. U.S. 42 lane widths will be restricted to 11 feet in both directions and 10 feet on Fenn Road, and left-turn lanes on both roads will be restricted to 10 feet. Excavation work will continue this week on the east side of Pearl Road and north side of Fenn Road. Work will continue through October.

?State Route 57, at its bridge over I-71: Intermittent lane closings for bridge repairs until further notice. One lane of two-way traffic will be maintained with flaggers. There will be lane restrictions on I-71 as needed.

?State Route 57, at the overlap of Route 57 and state Route 252 near Mallet Creek in York Township: Closed until Friday for a culvert replacement. A detour will be posted.

?State Route 303, between West 130th Street and I-71: Reduced to one lane of traffic in each direction to install final pavement markings until the end of June. All work will be at night.

?Spencer Lake Road, between Richman Road west and Richman Road east in Chatham Township: Closed through July 29 for a bridge replacement.

?Garman Road, between Avon Lake Road and Friendsville Road in Harrisville Township: Closed until early July for road construction.

PORTAGE COUNTY:

?Canada Road, between state Route 44 and Peck Road in Mantua: Closed through late July for a bridge replacement. Detour will be Route 44 to Goodell Road to Peck Road.

?State Route 700 over I-76/Ohio Turnpike in Freedom Township: Closed through early August for a bridge deck replacement on the turnpike. Detour will be state Route 303 to state Route 88 to state Route 82.

?State routes 43 and 82 in Aurora: Route 82 between Route 43 and the Summit County line will have daily lane restrictions for resurfacing through late July. Route 82 between Chesterton Lane and Cochran Road will be closed through late June for a bridge replacement. Detour will be state Route 91 to I-490 to state Route 14 to Route 43. Route 43 between the southern Aurora limits and Route 82 between Treat Road and the Geauga County line will have daily lane restrictions for resurfacing until further notice.

?State routes 14 and 59 in Ravenna Township: Until further notice, Route 14 between state routes 5 and 59 will be reduced to one lane of traffic in each direction. Route 59 westbound between state Route 5 and Route 14 will be closed through late August for road reconstruction. Detour is Route 5 to Route 14.

?I-76, between New Milford Road and Rock Springs Road in Edinburg and Rootstown townships: There are nightly lane restrictions from 7 p.m. to 6 a.m. for milling and resurfacing until further notice.

?Norton Road, between state Route 700 and state Route 88 in Hiram Township: Closed through late July for a bridge replacement. A detour is posted.

?State Route 225, between state Route 14 and just north of I-76 in Deerfield and Palmyra townships: Lane restrictions until further notice for resurfacing.

STARK COUNTY:

?State Route 236, just north of Clearway Street in Jackson Township: Closed through Friday for a culvert replacement. Detour is state Route 21 to state Route 93.

?U.S. 30, between the Wayne County line and state Route 627 in Massillon and Perry and Tuscarawas townships: Until further notice, there will be daily lane restrictions for pavement repairs and crack sealing.

?U.S. 30 in Canton and Canton Township: U.S. 30 eastbound between Harrison Avenue and Cleveland Avenue is reduced to one lane through late June. The Harrison Avenue entrance ramp to U.S. 30 eastbound is closed through late June for bridge deck overlays. A detour is posted. Between Route 297/Raff Road and state Route 43/Waynesburg Road, there will be lane restrictions for pavement repairs and resurfacing until further notice.

?U.S. 30 in Canton and Osnaburg townships and East Canton: U.S. 30 between Trump Avenue and the eastern East Canton limits will have lane restrictions for pavement repairs and resurfacing until further notice.

?State Route 800, between the Tuscarawas County line and 45th Street in Pike and Canton townships: Daily lane restrictions for resurfacing until further notice.

?State Route 800, between 34th Street and 45th Street in Canton Township: Reduced to one lane of traffic in each direction for road widening until further notice.

?Freed Street, between Baird Avenue and Fox Avenue in Paris Township: Closed through mid-August for a bridge replacement. Detour will be Baird Avenue to state Route 172 to Fox Avenue.

WAYNE COUNTY:

?State Route 21, between the Stark County line and the Summit County line: Intermittent lane closings for a spot pavement repair project until further notice. One lane of traffic will be maintained in each direction at all times.

?State Route 83 and Smithville Western Road intersection: Closed to construct a roundabout. Detours will be posted. The intersection is expected to reopen Aug. 15.

Elsewhere in Northeast Ohio:

?I-77 bridge deck replacement over Cuyahoga River Valley, Independence and Cuyahoga Heights in Cuyahoga County: Through late June, there will be lane closings during off-peak hours on I-77 between Rockside Road and state Route 21. Closing times will be adjusted to avoid interfering with downtown Cleveland events.

?I-77 bridge over Cuyahoga River Valley, Independence and Cuyahoga Heights in Cuyahoga County: Painting of the structural steel on the bridge is under way. Work will take place seven days a week from 7 a.m. to 7 p.m. with minimal impacts to traffic.

?I-71 resurfacing in Strongsville and Middleburg Heights: Overnight Monday through Friday until mid-July, various lanes will be closed between Boston Road and Royalton Road from 7 p.m. to 6 a.m. for resurfacing.

Traffic planners: Please fax traffic updates to 330-996-3033.